Our Home Office

Posted by:

5719 Zip Drive, Fort Myers, Florida is where we call home. In 2005, Future Controls, Inc. designed and built this facility, which includes 3,500 square feet of office space, including a large conference room, in addition to the office space, we have about 5,000 square feet of warehouse/storage space for inventory.

Continue Reading →
0

HAPPY BIRTHDAY FUTURE CONTROLS!

Posted by:

Future Controls, Inc. was founded and incorporated by James Norman Nevitt in 1982. He established our company with a goal to reduce our customer’s energy costs through the offering of a variety of services focused on energy conservation in air conditioning systems. Today we still carry that goal and passion! Here’s to 40 more!

Continue Reading →
0

Future Controls was there!

Posted by:

Future Controls inc was there at AFW Andrews Air Force Base in Maryland upgrading their controls. While onsite their existing chiller went down and needed compressors changed ASAP. Future Controls sent a couple of their best to get them back up in and running!

Continue Reading →
0

Honored to still serve our very first customer 38 years later

Posted by:

First Assembly of God is Future Controls inc very first customer and we still proudly serve them 38 years later. On this day we were replacing a roof top unit in the children’s center and upgrading their building automation controls with Ecostruxure, the latest from Schneider Electric. We are Honored to take care of their large facility and hope its for another 38 years.

Continue Reading →
0

West Palm Beach Air Traffic Control

Posted by:

In 2011, The West Palm Beach Air Traffic Control Tower was commissioned with Future Controls, Inc. providing and installing the Building Management system for the complete HVAC system for both critical and non critical applications.

Continue Reading →
0

Skills to get the job done.

Posted by:

In 2005, Contessa Condos, our service customer challenged us with replacing their 2 cooling towers on the top of their 22 story building. The pathway to the facility had brand new pavers installed and we were not allowed to bring a crane to run on top of the new pavers. Therefore, as shown in this picture, we landed a helicopter on the beach nearby and attached the cooling towers for the helicopter to fly them to the roof

Continue Reading →
0

Watson Clinic

Posted by:

In 2015, this state of the art 2-story medical office building was commissioned with Future Controls, Inc. providing and installing the Building Management System with full array of equipment integration, including HVAC, lighting and power monitoring systems.

Continue Reading →
0