Future Controls is excited to wrap up another FAA air traffic control tower at GSO in Greensboro North Carolina. We are scheduled to turn this project over early to mid 2021.
Continue Reading →FEB
2021
Future Controls is excited to wrap up another FAA air traffic control tower at GSO in Greensboro North Carolina. We are scheduled to turn this project over early to mid 2021.
Continue Reading →First Assembly of God is Future Controls inc very first customer and we still proudly serve them 38 years later. On this day we were replacing a roof top unit in the children’s center and upgrading their building automation controls with Ecostruxure, the latest from Schneider Electric. We are Honored to take care of their large facility and hope its for another 38 years.
Continue Reading →Future Controls Inc Is onsite at the new RSW Control Tower in Fort Myers Florida! Working With Deangelis Diamond we look to close out this project mid to late 2021!
Continue Reading →Posted by:
5719 Zip Drive, Fort Myers, Florida is where we call home. In 2005, Future Controls, Inc. designed and built this facility, which includes 3,500 square feet of office space, including a large conference room, in addition to the office space, we have about 5,000 square feet of warehouse/storage space for inventory.
Continue Reading →Posted by:
In 2011, The West Palm Beach Air Traffic Control Tower was commissioned with Future Controls, Inc. providing and installing the Building Management system for the complete HVAC system for both critical and non critical applications.
Continue Reading →Posted by:
In 2005, Contessa Condos, our service customer challenged us with replacing their 2 cooling towers on the top of their 22 story building. The pathway to the facility had brand new pavers installed and we were not allowed to bring a crane to run on top of the new pavers. Therefore, as shown in this picture, we landed a helicopter on the beach nearby and attached the cooling towers for the helicopter to fly them to the roof
Continue Reading →Posted by:
In 2015, this state of the art 2-story medical office building was commissioned with Future Controls, Inc. providing and installing the Building Management System with full array of equipment integration, including HVAC, lighting and power monitoring systems.
Continue Reading →