INET – System running slower than expected?

Posted by:

An INET control system running INET software is normally a quick responding system where accessing point data happens within a few seconds. However, occasionally we run into systems  that seem to be running slower than expected – in rare instances, we have experienced systems that take up to 45 seconds or more to access data.

Here are a few examples of what you might experience if your system isn’t fully optimized:

A. Logging into a controller or saving a database (LIU’s are the exception) ...

Continue Reading →
0

Schneider Electric Proud Partner – Florida, USA

Posted by:

Future Controls, Inc. has been a proud partner of  Schneider Electric since the days of when it was first CSI (Control Systems International) and then embraced the TAC acquisition and the introduction of the Vista line to now, Schneider Electric where we represent the INET, Vista and Andover Continuum product lines – providing sales, service and installation, in other words, we offer the complete solution to all your Building Management/Automation needs.

Continue Reading →
1
Page 3 of 3 123